Seawater Desalination Systems Series
24 m³/d SWRO-1T Container Desalination System
Professional turnkey desalination plant in a 20-foot standard container, delivering 24 cubic meters per day (1 m³/h) of potable water. Complete automation, weather protection, and rapid deployment for island outposts and emergency water supply.
Supports 50-100 people daily water needs.
Rapid deployment within 24 hours.
Seawater Reverse Osmosis Process
Complete seawater desalination from intake through pre-treatment, high-pressure reverse osmosis, and post-treatment to produce potable water meeting WHO drinking water standards.
Where This System Is Used
Designed for rapid deployment scenarios including island outposts, emergency relief, and remote facilities requiring quick commissioning and reliable automated operation.
Island Outposts
Rapid water supply deployment for remote islands, territorial outposts, and strategic locations requiring immediate fresh water availability.
Emergency Relief
Immediate water supply for disaster-stricken coastal areas, tsunami recovery, earthquake relief, and humanitarian emergency response operations.
Temporary Camps
Mobile water supply for coastal construction projects, temporary work camps, and short-term installations requiring relocatable systems.
Border Stations
Self-sufficient water supply for coastal border patrol stations, maritime checkpoints, and security installations in remote areas.
Configured for Your Application
Each SWRO-1T system is configured based on your deployment timeline, seawater quality, power availability, and operational requirements to ensure reliable performance from day one.
Seawater Analysis
Rapid assessment of target seawater characteristics and pre-configuration of membrane protection systems for immediate operation upon arrival.
System Configuration
Customize power input options, control automation level, emergency backup systems, and weatherproofing based on deployment scenario and climate.
Factory Testing & Delivery
Complete pre-commissioning, performance verification, and operator training materials. Ships globally via standard container logistics with all accessories.
Need an Emergency-Ready
Desalination System?
Contact our engineering team to discuss your deployment timeline, seawater source, and operational requirements. We'll configure a rapid-deployment SWRO-1T system for your emergency or remote application.