Integrated Water Purification Equipment Series

80 m³/h Integrated Water Purification System

Centralized valve-type integrated water purification system delivering 80 cubic meters per hour with front-mounted control valves for simplified maintenance and operation.

80 m³/h Capacity
Centralized Valves
≤3 NTU Output
Request a Quote

Front-mounted valves for easy maintenance access.
Suitable for rural centralized water supply.

80 m³/h Integrated Water Purification System with Centralized Valves
01/ Process Overview

Centralized Valve Control Process

Complete surface water treatment with all control valves and piping centralized on a front-mounted panel for easy operator access, maintenance, and troubleshooting.

80 m³/h Integrated Water Purification Process Diagram
The centralized valve design consolidates all major control and isolation valves on a front-accessible panel, eliminating the need to walk around the equipment for routine operation. This reduces operator training requirements and allows faster response to process upsets.
02/ Applications

Where This System Is Used

Ideal for rural centralized water supply, reservoir treatment, and applications where ease of operation and maintenance is prioritized.

Rural centralized water supply site for low-skill operator locations

Low-Skill Operator Locations

Rural villages (700-1300 people) where operators have limited technical training. Centralized valve panel with clear labels reduces training time from weeks to days and minimizes operational errors.

Seasonal tourism facility or camp with simplified operation needs

Seasonal Operations

Tourism facilities, seasonal camps, or irrigation district offices that operate intermittently. Centralized controls simplify shutdown, startup, and winterization procedures for non-specialist staff.

Small industrial facility maintained by general maintenance staff

Multi-Skilled Staff Sites

Small industrial facilities, food processing plants, or manufacturing sites where water treatment is maintained by general maintenance staff, not dedicated water treatment technicians.

Remote mining or construction camp with high operator turnover

High-Turnover Environments

Mining camps, remote construction sites, temporary facilities where operator turnover is high. Intuitive front-panel design allows new operators to become functional within one shift.

03/ Custom Engineering

Configured for Your Project

Valve panel layout and control system customized based on operator skill level, maintenance capabilities, and local operational practices.

Process & Operator Analysis

Evaluate raw water variability, operator training level, and maintenance resources to determine optimal valve arrangement and control features.

Valve Panel Design

Design front-mounted valve panel with clear labeling, color coding, and logical grouping to minimize operator error and training requirements.

Factory Assembly & Documentation

Pre-assemble valve panel and piping, conduct functional testing, and prepare operator manuals with photo-based troubleshooting guides.

Need an 80 m³/h
Easy-Maintenance Treatment System?

Describe your operator training level, maintenance capabilities, and raw water source. We'll configure a centralized valve system that matches your operational resources.

Experienced Engineers
Simplified Operation
Easy Maintenance
Technical Support