Integrated Water Purification Equipment Series
80 m³/h Integrated Water Purification System
Centralized valve-type integrated water purification system delivering 80 cubic meters per hour with front-mounted control valves for simplified maintenance and operation.
Front-mounted valves for easy maintenance access.
Suitable for rural centralized water supply.
Centralized Valve Control Process
Complete surface water treatment with all control valves and piping centralized on a front-mounted panel for easy operator access, maintenance, and troubleshooting.
Where This System Is Used
Ideal for rural centralized water supply, reservoir treatment, and applications where ease of operation and maintenance is prioritized.
Low-Skill Operator Locations
Rural villages (700-1300 people) where operators have limited technical training. Centralized valve panel with clear labels reduces training time from weeks to days and minimizes operational errors.
Seasonal Operations
Tourism facilities, seasonal camps, or irrigation district offices that operate intermittently. Centralized controls simplify shutdown, startup, and winterization procedures for non-specialist staff.
Multi-Skilled Staff Sites
Small industrial facilities, food processing plants, or manufacturing sites where water treatment is maintained by general maintenance staff, not dedicated water treatment technicians.
High-Turnover Environments
Mining camps, remote construction sites, temporary facilities where operator turnover is high. Intuitive front-panel design allows new operators to become functional within one shift.
Configured for Your Project
Valve panel layout and control system customized based on operator skill level, maintenance capabilities, and local operational practices.
Process & Operator Analysis
Evaluate raw water variability, operator training level, and maintenance resources to determine optimal valve arrangement and control features.
Valve Panel Design
Design front-mounted valve panel with clear labeling, color coding, and logical grouping to minimize operator error and training requirements.
Factory Assembly & Documentation
Pre-assemble valve panel and piping, conduct functional testing, and prepare operator manuals with photo-based troubleshooting guides.
Need an 80 m³/h
Easy-Maintenance Treatment System?
Describe your operator training level, maintenance capabilities, and raw water source. We'll configure a centralized valve system that matches your operational resources.